According to various sources, Mater Dei lost power on Monday night as generators failed to start supplying power for around 40 minutes in specific parts of the building.
The power went out at around 0100hrs, with Times of Malta reporting that power went out again before 0700hrs.
The news lead to Nationalist MPs calling out the power crisis, with Opposition Leader Bernard Grech writing:
‘He told us it’s not a national crisis’, referring to Prime Minister Robert Abela, ‘€400 million were given to Vitals and Steward and tranquility of mind cannot be ensured in the health sector.’
PN MEP David Casa also reported the news, saying that the patients at the hospital are suffering the mistakes of Robert Abela. PN MP Ian Vassallo Hagi also posted, thanking the Mater Dei staff for doing their best to mitigating the inconvenience caused.
#MaltaDaily