During an interview with Transport Minister Ian Borg conducted by Chris Peregin from Lovin’ Malta, the minister unveiled a huge metro project being planned which will cost billions for Malta. When asked about the project, Ian Borg pointed out that the project will take a long span of time to complete, possibly extending beyond his time in office, as one line of the metro would take around 10 to 15 years to complete. The metro will include 25 stations in 25 different squares.
Research, planning and studies required for the project are still underway. The project will require manoeuvring around several Maltese lands which include archeological spaces and environmental areas, and thus necessitates open discussion.
#MaltaDaily